H + R GmbH Deutsch

H+R COOLING TOWER SILENCERS

DOWNLOAD PDF

 IN FOCUS  

Since its inception H+R GmbH has been successful in acquiring all the projects GLOBALLY for Natural Draft cooling towers that requires air inlet noise baffles. 
 
We pride ourselves in not just being a supplier but a partner who stands by the equipment before, during and after installation. 

Engineering, manufacturing and assembly under one roof.

From engineering via manufacturing to assembly, we design and implement individual components and complete system solutions for all cooling tower applications

  • Engineering
  • Project management
  • Tests
  • R&D
  • Supply
  • Assembly
  • Maintenance and Service. 

H+R COVERS THE ENTIRE LIFE CYCLE OF THE COOLING TOWER:

INSTALLATION OF BAFFLES

(Hybrid Cooling Tower)

ACOUSTIC SIMULATION

(Noise Emission of Cell Cooling Tower)

AT A GLANCE

    • Pre-assembling
    • Installation
    • Inspection
    • Maintenance
    • Monitoring
    • Testing
    • Feasibility study
    • Overhaul
    • Upgrade

H+R supports its clients with own site staff. Scope of Service can include pre-assembly of FRP-frames and thermal components as well installation of mechanical components of the cooling tower up to assembly of entire FRP cooling towers.

After start-up H+R can assist for high availability and efficiency with tailored inspections and maintenance, analysis and evaluation, cleaning work, wear exchange, check of mechanical parts